Wind Power in Denmark
The Danish government’s commitment to wind-derived electricity has been enshrined in a succession of energy plans.In early 1999,the total installed wind power ca¬pacity of 1500 MW already supplied 10% of the country’s electricity.This figure was actually set in the Danish Government’s new plan of action (1996) as the target for 2005.The impressive growth of total installed wind energy capacity can be seen in Fig.5.To show its commitment to CO2 reduction,the Danish government decided in 1997 to phase out coal completely as a fuel in power stations.
By 2030,wind power is expected to supply 50% of Den¬mark’s electricity and a quarter of its total energy require¬ments.This is the most ambitious wind energy target in the world.To reach this level,a capacity of 5500 MW will have to be installed by then.This will save 14 million tons of CO2 each year.4000 MW of the total are planned to be erected in offshore wind farms.
New management systems will have to be devised to en¬sure that such large quantities of wind power are integrated smoothly into the national electricity grid.In the Nordic system with large hydro capacities,Denmark is very well situated to integrate its growing wind power capacities into the Scandinavian electricity system.It has been proposed by various studies,commissioned by government agencies to exploit the excess quantities of hydropower produced in neighboring Norway.When the wind blows the strongest,the hydro reservoirs would be turned down; when the wind dies down,they would be opened up again.Such adjustments are possible in a matter of seconds.
手工翻译的比较好的话,
只要翻译的好,我一定不会让您白忙活的……
英语翻译Wind Power in Denmark The Danish government’s commitment
Wind Power in Denmark
丹麦的风力发电
The Danish government’s commitment to wind-derived electricity has been enshrined in a succession of energy plans.In early 1999,the total installed wind power ca¬pacity of 1500 MW already supplied 10% of the country’s electricity.This figure was actually set in the Danish Government’s new plan of action (1996) as the target for 2005.The impressive growth of total installed wind energy capacity can be seen in Fig.5.To show its commitment to CO2 reduction,the Danish government decided in 1997 to phase out coal completely as a fuel in power stations.
一系列的能源计划,凸显着丹麦政府发展风电的承诺.1999年初,该国风力发电总量为1500MW,占全国供电量的10%.别忘了,这一数字是1996年丹麦政府为2005年制定的发展目标.风电总装机量增长,可见图5.为实现其减排二氧化碳的承诺,丹麦政府1997年决定逐步淘汰为发电站提供燃料的煤炭.
By 2030,wind power is expected to supply 50% of Den¬mark’s electricity and a quarter of its total energy require¬ments.This is the most ambitious wind energy target in the world.To reach this level,a capacity of 5500 MW will have to be installed by then.This will save 14 million tons of CO2 each year.4000 MW of the total are planned to be erected in offshore wind farms.
到2030年,风电将为丹麦提供50%的电量,满足该国25%的总能源需求.如此雄心勃勃的目标,在全球范围内没有第二个.为实现这一目标,丹麦的风电总装机量届时将达到5500MW;这将使该国每年减排二氧化碳1400万吨.将有4000MW的风电机组将安装在近海风电农场里.
New management systems will have to be devised to en¬sure that such large quantities of wind power are integrated smoothly into the national electricity grid.In the Nordic system with large hydro capacities,Denmark is very well situated to integrate its growing wind power capacities into the Scandinavian electricity system.It has been proposed by various studies,commissioned by government agencies to exploit the excess quantities of hydropower produced in neighboring Norway.When the wind blows the strongest,the hydro reservoirs would be turned down; when the wind dies down,they would be opened up again.Such adjustments are possible in a matter of seconds.
为确保如此大规模的风电机组平稳融入国家电网,丹麦不得不设计出新的管理系统.在有着丰富水电资源的北欧,丹麦在将日益增长的风电融入斯堪的纳维亚半岛的电力体系上有着相当的优势.不少官方委托的研究均建议丹麦应充分利用邻国挪威过量的水电资源.当风力发电条件适合是,水电站将被关闭;当无法进行风力发电时,水电站又将重开.如此调整,可在分秒间实现.